Project Description

Project Description

McCrossin Foundations installed 28 cantilevered piles for a trash rack installed to protect an intake structure on the Susquehanna River. Installation of the piles was performed from a temporary access ramp and barges. Tolerances on both the hole location and piles were critical for the rack installation. In additional to the trash rack piles, 6 pipe piles were installed for a floating boom.

Project Details

Job Name: Floating Boom and Trash Rack

Job Location: Pennsylvania

Job Type: Marine, Drilled Shafts

Start Date: October 2011

Completion Date: February 2012