The 4-mile long 55-A1 portion of the Southern Beltway consists of three mainline bridges and one overpass structure. The Beltway will take Interstate-576 and connect US-22 to Interstate-79.

McCrossin Foundations was subcontracted to drive over 400 bridge abutment piles for the construction of the new bridges.   The 12-inch h-piles ranged in lengths from 35 to 75 feet and were driven to absolute refusal.

Project Details

Job Name: Southern Beltway Section 55-A1

Job Location: Bulger, PA

Job Type: Pile Driving

Start Date: April 2017