CSVT North Section
Project Description
Design, furnish, and install temporary support of excavation at two pier locations for the bridge replacement of SR 15 over the Chillisquaque Creek in Milton, PA. The temporary shoring shall consist of a total of approximately 5,000 SF of soldier beam retaining wall utilizing both cantilever and tied back systems. All shoring shall be installed in multiple phases over the course of 2017 and into 2018.