Ross Park Mall – Pyrite Remediation
Project Description
McCrossin Foundations was subcontracted to perform foundation remediation work inside of Ross Park Mall, located north of Pittsburgh, PA. The remediation work was necessary due to the presence of pyritic soil, which when mixed with water, heaved the existing floors to one of the malls wings. The work was performed at night inside the mall. A low-clearance drill rig was used due to only having 14 feet of headroom available. In total, 21 micropiles were installed prior to the new floor slabs being poured. All material was carried into the mall from a staging space outside and every night the drill was removed from the space to allow the General Contractor to perform miscellaneous work throughout the day.